Pipework
Pipework
Showers
Maintenance
Shower Installation
Hot Water Cylinders
Pipework
Hot Water Systems
Regulations
Materials
- Copper [BS EN 1057] Table X
- Copper is susceptible to corrosion when directly contacted with Galvanised LCS
- Grade 3
- Galvanised LCS
- Polybutylene
- Chlorinated Polyvinyl-chloride (cPVC)
- uPVC (unplasticized) for cold water (brittle above 20°C)
- Cross-linked polyethylene (PE-X) – under-floor heating (tends to sag)
Thermal Movement Allowance
- Gland expansion joints
- Expansion loops
- Horseshoe expansion loops
Trace Heating
- frost and dead legs protection for industrial
Hydrauling Gradient
Secondary Circulation
- Return to 1/3 from the top of the vessel
- Bronze Pump MUST be used to avoid the pump rusting
- MIN return temperature is 50°C
- Controlled by a Time Switch
- MAX Length of HW pipework without secondary return
- ≤22mm – 12m
- ≤28 mm – 7.5m
- >28mm – 3m
- MAX 30 sec for HWÂ to reach a tap